Project: Reconstruction of ACI marine Cres

Employer: ACI Club d.d. Opatija

Removal and caring for existing outdated berths, workshop production of floating pontoons 9m long, 3m breadth, 0,85m high with 0,5m freeboard, to be incorporated into nine new afloat berths 45 to 135 m long, boat tuging the pontoons, production and instalation of anchoring RC blocks under the water by scuba divers. Reconstruction of water main network, electrical network and hydrant network. We perform the role of Employer's Project manager and FIDIC Engineer.  